- Brussels, Belgium
- Project
- Transit Infrastructure
Metro Line 3
The Metro Line 3 in Brussels is a project that contains a new route with 18 stations. It stretches over a length of 10.3km. Due to the new Metro Line, it is possible to travel from Evere, through the city center, to Forest in under 20 minutes.
—
The Joint Venture S.M. Toots (BESIX/JDN/Franki) use Maturix for the Metro Line 3 project.
The Maturix In-situ solution is providing S.M. Toots with real-time data from the site to document the quality of their concrete structures. Additionally, it sends notifications when the concrete strength reaches the required level.
Tagged Project