Brusells Metro Line 3
Image: Besix

Metro Line 3

The Metro Line 3 in Brussels is a project that contains a new route with 18 stations. It stretches over a length of 10.3km. Due to the new Metro Line, it is possible to travel from Evere, through the city center, to Forest in under 20 minutes.

The Joint Venture S.M. Toots (BESIX/JDN/Franki) use Maturix for the Metro Line 3 project.

The Maturix In-situ solution is providing S.M. Toots with real-time data from the site to document the quality of their concrete structures. Additionally, it sends notifications when the concrete strength reaches the required level.