MATURIX PROJECTS

> 750 projects since 2019
> 25 countries

MATURIX® SOLUTION

How Maturix is used for on-site casting at a construction site.

How a precast factory can benefit from using smart concrete monitoring.

CASE STUDIES

Monitoring the curing process enables following the tight schedule for a high-rise building while ensuring safety and product quality.

When constructing a bridge, it is essential to control the curing process to ensure a safe construction project.

Contiga, the largest precast factory in the Nordics uses Maturix and improved productivity drastically with using Maturix on a daily basis.

Integrating concrete monitoring in the heating system offers high potential to cut energy costs in a precast factory. Contiga keeps energy costs low with Maturix.

Optimization saves time and money at the large infrastructure project at the Norwegian Coast. Tunnels, bridges and other highway structures are monitored.

Extensive precast elements are monitored at Aarsleff BIZ to gain real-time insight into the curing process and to boost efficiency for Aarsleff BIZ.

Let's find out together, how Maturix can boost efficiency in your daily work!